*Updated with photos :p*
Woot !! Got the keys to the house already :D hehehe... but when checked the condition of the house, seems like need to do alot more things to fix for the house to be liveable....
Things to do
1. Change Master Bedroom Lock, previous owner lost the key so if it gets lock we have to sleep in the hall and have access to only one bathroom lol
This door doesnt have keys to unlock it
2. Repaint the hall, the door grill and all three rooms
The grill have already rusted
3. Relocate the aircond from the master bedroom to the 3rd room and get a new aircond as the aircond not in optimum condtion, to also wash/maintain the 2 airconds
This aircond have no control and looks like wanto die like tat
4. Install sliding windows or curtain to the washing machine drying area
Outsiders are able to see into the hallway as its veli open
5. Install curtain rails to the main hall, master bedroom & 2nd room windows
The Living Hall with the tinted windows, and a black patch which i think was caused by the previous owner tv emission?
6. Detach the 3rd room ceiling fan as its too big
Its taking 80% of the ceiling space...
7. Fix the dining hall light
That light with the 3 bulbs cannot be switch on, have no idea why, the black path on the right is from the previous owner praying altar
8. Fix the toilet door, condition still ok but not easy to slide open/close
9. Relaminate toilet door as both doors have horrible pictures
Everyday have fish ? Noooooo....
10. Cement a small part of the wall near the door entrance
What else am i missing out ? mmmm...
Outside view from the living hall, the owner left the astro satelite dish for us, but doubt will be getting astro at home :p
Build In kitchen cabinet, the black hole is for the gas cooker hub
Build In wardrobe in the master bedroom
The 2nd Room
The 3rd Room
Countdown : 6 Months less one day
1 comment:
oOooo...congrats on ur new pig sty..hehe.. getting more n more excited to ur BIG day ya.. = ))
Post a Comment